EREN(1+1)×600MW Thermal Power Plant, Turkey

   

With CMEC as General Contractor, EREN project is two sets of 600MW supercritical coal-fired power generating unit,. These units are equipped with the wet type limestone FGD system and SCR De-Nox unit. In addition, the high efficiency ESP is installed, while the boiler ignition system is the plasma burner with the easy operation and cost saving performance. Exported from China and built in Turkey both for the first time, this project is a supercritical coal-fired power generating unit with a single-unit capacity of 600MW. 

The project won: 

2015 China Luban Award for Excellent Construction Engineering (Overseas Projects) 

Completion time: November 2010